WTTC


  Content

Home
Preparation/ background
Warn- and alarm plan
MIWAC

Inventory of risk spot
Workshops


Final report

  Contact

financed by



Federal Ministry for the Environment,
Nature Conservation and Nuclear Safety
   
Development of the transboundary warn and alarm system for the river catchment area of Neman / Nemunas

 
Inventory of risk spot
 

.
Industrial safety measures at installations are a condition for the effective prevention of major accidents. A model-like record of relevant industrial activities in the Neman/Nemunas catchment area was drawn up to obtain a general picture of the existing risk potential. A rough evaluation of the accident potential of the enterprises examined was made by means of the Water Risk Index Method.

 

Component task 3:
Setting up a database on potential water hazards and drawing up an assessment logarithm


Annex 6 of final report (German)
Annex 6 of final report (Russian)

 


 

 
Downloads
(PDF-Files)

 
Risk spots Russian Federation
(48 KByte)
Risk spots Lithuania
(55 KByte)
Risk spots Belarus
(26 KByte)
accidental risk spots
(719 KByte)
Checklists for registration of the actual state
RI3 1a
(58 KByte)
RI3 2a
(64 KByte)
DR 3 1 predprijatija
(37 KByte)
DR3 2a
(72 KByte)

Links


Results of the UNECE Joint Ad Hoc Expert Group
Precaution of major accidents in Kura-river basin
UBA (German EPA) safety of industrial installations